Click here to make tpub.com your Home Page

Page Title: PRESSURE TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
PRESSURE TEST
(1) Position drain pan under air/hydraulic
manifold.
(2) Disconnect hydraulic hose 521 from
port P2.
(3) Connect STE/ICE-R between hydraulic
hose 521 and port P2.
(4) Position SUSPENSION knob to LOWER
(TM 9-2320-366-10-1).
(5) Position FUNCTION SELECT knob to
SUSPENSION (TM 9-2320-366-10-1).
(6) Operate back-up hydraulic pump
(TM 9-2320-366-10-1) and perform
STE/ICE-R Test #51.
(7) If 2,500-4,000 psi (17,238-27,580 kPa) is
not present, go to step 14 of this fault.
(8) If 2,500-4,000 psi (17,238-27,580 kPa) is
present, replace air/hydraulic manifold
(para 19-4).
(9) Disconnect STE/ICE-R from hydraulic hose
521 and port P2.
(10) Connect hydraulic hose 521 to port P2.
Change 1
2-2228.15

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business