Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
TM
CONTINUITY TEST
(1)
Disconnect connector P110 from CTIS ECU.
(2)
Set multimeter to ohms.
(3)
Connect positive (+) probe of multimeter to
connector P111D.
(4)
Connect negative (-) probe of multimeter to
connector P110E and note reading on
multimeter.
(5)
If continuity is not present, repair wire 1528
(para 2-45) or replace CTIS cable assembly
(6)
If continuity is present, replace CTIS ECU
(para 12-6).
(7)
Connect connector P110 to CTIS ECU.
(8)
Connect connector P111 to connector J111.
(9)
Install kick panel (para 16-3).
2-2141/(2-2142 Blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business