Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
(1) Set multimeter to ohms.
(2) Connect positive (+) probe of multimeter to
worklights switch terminal 1.
(3) Connect negative (-) probe of multimeter to
worklights switch terminal 5.
(4) Position worklights switch to on
(TM 9-2320-366-10-1) and note reading on
multimeter.
(5) If continuity is not present, replace
worklights switch (para 7-18).
(6) Connect connector P905 to worklights
switch.
(7) Position auxiliary panel on auxiliary panel
housing with six screws.
(8) Tighten six screws to 24 lb-in. (3 Nm).
Change 1
2-1543

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business