Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
CONTINUITY TEST
(1) Set multimeter to ohms.
(2) Connect positive (+) probe of multimeter
to terminal block TBC(1).
(3) Connect negative (-) probe of multimeter to
to terminal block TBC(2) and note reading
on multimeter.
(4) Connect positive (+) probe of multimeter
to terminal block TBC(2).
(5) Connect negative (-) probe of multimeter to
to terminal block TBC(3) and note reading
on multimeter.
(6) Connect positive (+) probe of multimeter
to terminal block TBC(3).
(7) Connect negative (-) probe of multimeter to
to terminal block TBC(4) and note reading
on multimeter.
(8) Connect positive (+) probe of multimeter
to terminal block TBC(4).
(9) Connect negative (-) probe of multimeter to
to terminal block TBC(5) and note reading
on multimeter.
(10) If continuity is not present between two
terminal blocks noted above, replace
jumper wire between terminal blocks that
continuity is not present (para 7-33).
(11) If continuity is present, replace M1089
winch control wiring harness (para 7-142).
(12) Close LH and RH catwalks.
(13) Install circuit breaker CB50 in PDP.
(14) Install wrecker control panel top cover
(para 14-4).
Change 1
2-1450.11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business