|
|
TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter on
contact two of boom down lockout solenoid
valve.
(3)
Connect negative (-) probe of multimeter to
contact one of boom down lockout solenoid
valve and note reading on multimeter.
(4)
If continuity is not present, notify DS
Maintenance.
(5)
If continuity is present, notify DS Maintenance.
(6)
Connect boom down lockout solenoid cable
to boom down lockout solenoid valve.
(7)
Connect batteries (para 7-57).
2-1409
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |