|
|
TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Loosen four screws on junction box.
(2)
Open cover on junction box.
(3)
Disconnect boom down lockout solenoid cable
connector from boom down lockout solenoid
valve.
(4)
Set multimeter to ohms.
(5)
Connect positive (+) probe of multimeter in
socket 1 of boom down lockout solenoid cable.
(6)
Connect negative (-) probe of multimeter to
terminal board position 19 and note reading on
multimeter.
(7)
If continuity is not present, replace boom down
lockout solenoid cable (para 7-105).
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter in
socket 2 of boom down lockout solenoid cable
connector.
(3)
Connect negative (-) probe of multimeter on
ground in junction box and note reading on
multimeter.
(4)
If continuity is not present, replace boom down
lockout solenoid cable (para 7-105).
(5)
Connect boom down lockout solenoid cable
connector to boom down lockout solenoid valve.
(6)
Close cover on junction box.
(7)
Tighten four screws on junction box cover.
2-1407
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |