Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Loosen four screws on junction box.
(2)
Open cover on junction box.
(3)
Disconnect hoist up lockout solenoid cable
connector from hoist up lockout solenoid.
(4)
Set multimeter to ohms.
(5)
Connect positive (+) probe of multimeter in
socket 1 of hoist up lockout solenoid
cable.
(6)
Connect negative (-) probe of multimeter to
terminal board position 19 and note
reading on multimeter.
(7)
If continuity is not present, replace hoist up
lockout solenoid cable (para 7-112).
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter in
socket 2 of hoist up lockout solenoid
cable connector.
(3)
Connect negative (-) probe of multimeter on
ground in junction box and note reading
on multimeter.
(4)
If continuity is not present, replace hoist up
lockout solenoid cable (para 7-112).
(5)
Connect hoist up lockout solenoid
cable connector to hoist up lockout
solenoid valve.
(6)
Close cover on junction box.
(7)
Tighten four screws on junction box
cover.
2-1403

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business