|
|
TM 9-2320-366-20-2
TM
e123. M1089 MATERIAL HANDLING CRANE (MHC) HOIST DOWN DOES NOT OPERATE FROM REMOTE
e123.
STATION (CONT)
KNOWN INFO
TEST OPTIONS
6.
Other crane functions from
Continuity Test or
Is continuity present
remote station OK.
STE/ICE Test #91
REASON FOR QUESTION
from remote control
Hoist down solenoid
If continuity is not present,
cable connector pin G
cable OK.
remote control cable is
to terminal board lower
Hoist down solenoid OK.
faulty.
position 16?
Remote control box
internal wiring harness OK.
HOIST UP/DOWN
NO
controller OK.
External remote control
cable OK.
POSSIBLE PROBLEMS
Faulty remote control
Replace remote control
cable.
cable (para 7-115 or 7-118).
YES
Notify DS Maintenance.
2-1328
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |