|
|
TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Loosen four screws on junction box.
(2)
Open cover on junction box.
(3)
Disconnect hoist up lockout solenoid cable
connector from hoist up lockout solenoid.
(4)
Set multimeter to ohms.
(5)
Connect positive (+) probe of multimeter in
socket 1 of hoist up lockout solenoid
cable connector.
(6)
Connect negative (-) probe of multimeter to
terminal board position 28 and note
reading on multimeter.
(7)
If continuity is not present, replace hoist up
lockout solenoid cable (para 7-92).
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter in
socket 2 of hoist up lockout solenoid
cable connector.
(3)
Connect negative (-) probe of multimeter on
ground in junction box and note reading
on multimeter.
(4)
If continuity is not present, replace hoist up
lockout solenoid cable (para 7-92).
(5)
Connect hoist up lockout solenoid
cable connector to hoist up lockout
solenoid valve.
(6)
Close cover on junction box.
(7)
Tighten four screws on junction box
cover.
2-1277
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |