|
|
TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Remove SWING CW/CCW controller (para 7-32).
(2)
Set multimeter to ohms.
(3)
Connect positive (+) probe of multimeter on pin
A of remote control box connector.
(4)
Connect negative (-) probe of multimeter on pin
3 of SWING CW/CCW controller internal
wiring harness and note reading on
multimeter.
(5)
Connect positive (+) probe of multimeter on pin
H of remote control box connector.
(6)
Connect negative (-) probe of multimeter on pin
1 of SWING CW/CCW controller internal
wiring harness and note reading on
multimeter.
(7)
If continuity is not present, replace remote
control box internal wiring harness (para 7-32).
(8)
If continuity is present, replace SWING
CW/CCW controller (para 7-32).
(9)
Install SWING CW/CCW controller
(para 7-32).
(10)
Close cover on junction box.
(11)
Tighten four screws on junction box cover.
(12)
Stow crane (TM 9-2320-366-10-1).
2-1267
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |