Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Disconnect hoist up solenoid connector from
hoist up solenoid.
(2)
Set multimeter to ohms.
(3)
Connect positive (+) probe of multimeter on pin
2 of hoist up solenoid cable connector.
(4)
Connect negative (-) probe of multimeter on
ground and note reading on multimeter.
(5)
Connect positive (+) probe of multimeter on pin
1 of hoist up solenoid cable connector.
(6)
Connect negative (-) probe of multimeter on
terminal board lower position 23 and note
reading on multimeter.
(7)
If continuity is not present, replace hoist up
solenoid cable (para 7-93).
(8)
If continuity is present, notify DS Maintenance.
(9)
Connect hoist up solenoid cable connector to
hoist up solenoid.
(10)
Close cover on junction box.
(11)
Tighten four screws on junction box cover.
(12)
Stow crane (TM 9-2320-366-10-1).
2-1179

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business