Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect jumper wire to connector J93-1.
(3)
Connect positive (+) probe of multimeter to
connector P43-1.
(4)
Connect negative (-) probe of multimeter to
jumper wire and note reading on multimeter.
(5)
If continuity is not present, repair wire 1403
(para 2-45) or replace engine control cable
assembly (para 7-80).
(6)
If continuity is present, replace ether sensor
(para 7-47).
(7)
Remove jumper wire from connector J93.
(8)
Connect connector J93 to ether valve
connector.
(9)
Connect connector clamp to ether valve
connector.
(10)
Connect connector J43 to connector P43.
(11)
Install instrument panel assembly (para 7-15).
2-1125

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business