Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Remove instrument panel assembly for
access (para 7-15).
(2)
Disconnect connector J114 from WTEC II
TEPSS.
(3)
Loosen screw in connector J116.
(4)
Disconnect connector J116 from WTEC II
VIM.
(5)
Set multimeter to ohms.
(6)
Connect positive (+) probe of multimeter to
connector J116-C2.
(7)
Connect negative (-) probe of multimeter to
connector J114-25 and note reading on
multimeter.
(8)
If continuity is not present, replace WTEC II
cab transmission harness (para 7-137).
(9)
If continuity is present, replace WTEC II
TEPSS (para 8-2).
(10)
Connect connector J114 to WTEC II TEPSS.
(11)
Install instrument panel assembly (para 7-15).
(12)
Connect connector J116 to WTEC II VIM.
(13)
Tighten screw in connector J116.
(14)
Install kick panel (para 16-3).
2-1081

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business