|
|
TM 9-2320-366-20-2
CONTINUITY TEST
(1) Disconnect batteries (para 7-57).
(2) Remove power distribution panel (PDP)
cover (para 16-2).
(3) Remove relay K11 from power distribution
panel (PDP).
(4) Set multimeter to ohms.
(5) Connect positive (+) probe of multimeter to
relay K11 terminal 30.
(6) Connect negative (-) probe of multimeter to
relay K11 terminal 87A and note reading on
multimeter.
(7) If continuity is not present, replace relay
K11 (para 7-9).
Change 1
2-1055
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |