|
|
TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter to
winch in solenoid L4 terminal 2.
(3)
Connect negative (-) probe of multimeter to
ground and note reading on multimeter.
(4)
If continuity is not present, repair wire 3069
(para 2-45) or replace winch control valve
cable assembly (para 7-135).
(5)
If continuity is present, replace winch control
valve assembly (para 17-25).
(6)
Connect winch in solenoid L4 connector on
solenoid L4 and tighten screw.
2-989
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |