|
|
TM 9-2320-366-20-1
TM
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter to
heater fan control switch orange wire.
(3)
Connect negative (-) probe of multimeter to
ground and note reading on multimeter.
(4)
If continuity is not present, go to step 4 of
this fault.
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Position heater fan control switch to high
speed.
(3)
Connect positive (+) probe of multimeter to
one heater fan control switch terminal.
(4)
Connect negative (-) probe of multimeter to
other heater fan control switch terminal and
note reading on multimeter.
(5)
If continuity is not present, replace heater fan
control switch (para 18-10).
(6)
If continuity is present, replace or repair
personnel heater (para 18-9).
(7)
Install heater fan control switch (para 18-10).
2-871
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |