|
|
TM 9-2320-366-20-1
TM
CONTINUITY TEST
(1)
Remove instrument panel assembly for access
(para 7-15).
(2)
Disconnect connector PX15 from main light
switch.
(3)
Connect positive (+) probe of multimeter to
connector PX15-K.
(4)
Connect negative (-) probe of multimeter to
PDP, terminal 87, where relay K6 was removed,
and note reading on multimeter.
(5)
If continuity is not present, repair wire 1404
(para 2-45) or replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III dashboard
cable assembly (para 7-11).
(6)
If continuity is present, replace relay K6
(para 7-9).
(7)
Install relay K6 in PDP.
(8)
Install PDP cover (para 16-2).
(9)
Connect connector PX15 to main light switch.
(10)
Install instrument panel assembly (para 7-15).
2-777
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |