Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
TM
CONTINUITY TEST
(1)
Remove PDP cover (para 16-2).
(2)
Remove relay K13 from PDP.
(3)
Set multimeter to ohms.
(4)
Connect positive (+) probe of multimeter to
PDP, socket 86, where relay K13 was removed.
(5)
Connect negative (-) probe of multimeter to
connector PX12-1 and note reading on
multimeter.
(6)
If continuity is not present, repair wire 1559
(para 2-45) or replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III dashboard
cable assembly (para 7-11).
(7)
Connect connector PX12 to warning light
switch.
(8)
Install instrument panel assembly (para 7-15).
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter to
PDP, socket 85, where relay K13 was
removed.
(3)
Connect negative (-) probe of multimeter to
ground and note reading on multimeter.
(4)
If continuity is not present, repair wire 3054
(para 2-45)or replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III dashboard
cable assembly (para 7-11).
2-653

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business