Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
TM
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter to
lamp socket.
(3)
Connect negative (-) probe of multimeter to
ground and note reading on multimeter.
(4)
If continuity is not present, repair wire 3091
(para 2-45) or replace front lights cable
assembly (para 7-82).
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter to
inside of blackout drive light housing.
(3)
Connect negative (-) probe of multimeter to
lamp socket and note reading on multimeter.
(4)
If continuity is not present, replace blackout
drive light (para 7-37).
(5)
If continuity is present, replace lamp
(para 7-37).
(6)
Install lamp in socket.
(7)
Install gasket and cover on housing with
three screws.
2-629

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business