|
|
TM 9-2320-366-20-1
TM
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter to
connector P18-3.
(3)
Connect negative (-) probe of multimeter to
connector P18-2.
(4)
If continuity is not present, replace turn
signal switch (para 7-26).
(5)
If continuity is present, repair wire 16A
(para 2-45) or replace WETC II dashboard cable
assembly (para 7-10) or WTEC III dashboard
cable assembly (para 7-11).
(6)
Connect connector P18 to connector J18.
(7)
Install instrument panel assembly (para
7-15).
(8)
Install relay K8 in PDP.
(9)
Install PDP cover (para 16-2).
CONTINUITY TEST
(1)
Remove three screws and washers from PDP.
(2)
Remove three screws from PDP.
(3)
Lift PDP outward to gain access.
(4)
Disconnect connector J27 from connector P27.
(5)
Set multimeter to ohms.
(6)
Connect positive (+) probe of multimeter to
PDP, relay K8 terminal 30, where relay K8 was
removed.
(7)
Connect negative (-) probe of multimeter to
connector J27-6 and note reading on
multimeter.
(8)
If continuity is not present, repair wire 17
(para 2-45) or replace WTEC II dashboard
cable assembly (para 7-10) or WTEC III
dashboard cable assembly (para 7-11).
(9)
If continuity is present, repair wire 17
(para 2-45) or replace front lights cable
assembly (para 7-82).
(10)
Connect connector P27 to connector J27.
(11)
Install PDP in dashboard with three screws.
(12)
Install three washers and screws in PDP.
(13)
Install relay K8 in PDP.
(14)
Install PDP cover (para 16-2).
2-553
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |