Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
TM
CONTINUITY TEST
(1)
Remove PDP cover (para 16-2).
(2)
Remove relay K8 from PDP.
(3)
Disconnect connector P12 (RH) or connector
P4 (LH) from housing.
(4)
Set multimeter to ohms.
(5)
Connect positive (+) probe of multimeter to
connector P12 (RH) or connector P4 (LH).
(6)
Connect negative (-) probe of multimeter to
PDP, terminal 87A, where relay K8 was
removed and note reading on multimeter.
(7)
If continuity is not present, go to step 5
of this fault.
(8)
Connect connector P12 (RH) or connector
P5 (LH) to housing.
CONTINUITY TEST
(1)
Set multimeter to ohms
(2)
Connect positive (+) probe of multimeter to
relay K8 terminal 87A.
(3)
Connect negative (-) probe of multimeter to
relay K8 terminal 30 and note reading on
multimeter.
(4)
If continuity is not present, replace relay K8
(para 7-9).
(5)
If continuity is present, replace turn signal
switch (para 7-26).
(6)
Install relay K8 in PDP.
(7)
Install PDP cover (para 16-2).
2-543

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business