Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
TM
(1)
Remove PDP cover (para 16-2).
(2)
Remove relay K11 from PDP.
(3)
Set multimeter to ohms.
(4)
Connect positive (+) probe of multimeter to
PDP, terminal 85, where relay K11 was
removed.
(5)
Connect negative (-) probe of multimeter to
PX7-23 and note reading on multimeter.
(6)
If continuity is not present, repair wire 34A
(para 2-45) or replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III dashboard
cable assembly (para 7-11).
(7)
Install relay K11 in PDP.
(8)
Install PDP cover (para 16-2).
(9)
Connect lighted indicator display to connector
PX7.
(10)
Position lighted indicator display in instrument
panel assembly with four screws.
(11)
Tighten four screws to 6-10 lb-in. (1 Nm).
(12)
Connect batteries (para 7-57).
2-527

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business