Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
CONTINUITY TEST
(1) Loosen four captive screws in lamp
mounting panel.
(2) Remove lamp mounting panel from lighted
indicator display housing.
(3) Remove high beam indicator lamps from
printed circuit board.
(4) Set multimeter to ohms.
(5) Check continuity through each high beam
indicator lamp and note reading on
(6) If continuity is not present, replace lamps
(para 7-16).
(7) If continuity is present, replace lighted
indicator display (para 7-16).
(8) Install high beam indicator lamps in
printed circuit board.
(9) Install lamp mounting panel in lighted
indicator display housing.
(10) Tighten four captive screws in lamp
mounting panel.
(11) Connect lighted indicator display to
connector PX7.
(12) Position lighted indicator display in
instrument panel assembly with four
screws.
(13) Tighten four screws to 6-10 lb-in. (1 Nm).
(14) Connect batteries (para 7-57).
2-453

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business