|
|
TM 9-2320-366-20-1
TM
CONTINUITY TEST
(1)
Remove six screws from auxiliary panel.
(2)
Lift auxiliary panel from auxiliary panel housing
to gain access.
(3)
Disconnect connector P914A from fuel preheat
switch, if equipped.
(4)
Set multimeter to ohms.
(5)
Connect positive (+) probe of multimeter to
connector J913-10.
(6)
Connect negative (-) probe of multimeter to
connector P914A-2 and note reading on
multimeter.
(7)
If continuity is not present, repair wire 3020
(para 2-45) or replace auxiliary panel cable
assembly (para 7-58).
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter to
connector P913-11.
(3)
Connect negative (-) probe of multimeter to
connector P914A-1 and note reading on
multimeter.
(4)
If continuity is not present, repair wire 1908
(para 2-45) or replace auxiliary panel cable
assembly (para 7-58).
(5)
Connect connector P914A to fuel preheat
switch, if equipped.
(6)
Position auxiliary panel housing on auxiliary
panel with six screws.
(7)
Tighten six screws to 24 lb-in. (3 Nm).
(8)
Connect connector P913 to connector J913.
(9)
Install personnel heater (para 18-9).
2-411
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |