Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
TM
NOTE
All auxiliary panel switch illumination
faults are traced the same way.
Power Take-Off (PTO) switch shown.
(1) Remove six screws from auxiliary panel.
(2) Lift auxiliary panel from auxiliary panel housing
to gain access.
NOTE
Main connector and "A" connector
will come off as a unit.
(3) Disconnect PTO switch connector from PTO
switch.
(4) Set multimeter to ohms.
(5) Connect positive (+) probe of multimeter to
PTO switch lamp terminal 1.
(6) Connect negative (-) probe of multimeter to
PTO switch lamp terminal 2 and note reading
on multimeter.
(7) If continuity is not present, replace lamp
(para 7-18).
2-405

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business