|
|
TM 9-2320-366-20-1
CONTINUITY TEST
(1) Lift dust boot on 24V BAT terminal stud on
200 AMP reverse polarity relay.
(2) Remove nut, lockwasher, terminal lug
TL168 from 24V BAT terminal stud on 200
AMP reverse polarity relay. Discard
lockwasher.
(3) Set multimeter to ohms.
(4) Connect positive (+) probe of multimeter
to terminal lug TL166.
(5) Connect negative (-) probe of multimeter to
terminal lug TL168 and note reading on
multimeter.
(6) If continuity is not present, replace 200
AMP terminal block to reverse polarity
relay 24 VDC battery cable (para 20-56).
(7) Position terminal lug TL168 on 24V BAT
terminal stud on 200 AMP reverse polarity
relay with lockwasher and nut.
(8) Tighten nut to 27-33 lb-ft (37-45 N.m).
(9) Position dust boot on 24 V BAT terminal
stud on 200 AMP reverse polarity relay.
(10) Position terminal lugs TL166 and TL1 on
right 24 VDC BAT terminal stud on 200
AMP terminal block with washer,
lockwasher, and nut.
(11) Tighten nut to 15-19 lb-ft (21-25 N.m).
Change 1
2-284.21
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |