|
|
TM 9-2320-366-20-1
CONTINUITY TEST
(1) Lift dust boot from left 24V LOAD terminal
stud on 200 AMP terminal block.
(2) Remove nut, lockwasher, washer, and
terminal lug TL44 from left 24V LOAD
terminal stud on 200 AMP terminal
block. Discard lockwasher.
(3) Remove nut, lockwasher, washer, and
terminal lug TL167 from right 24V LOAD
terminal stud on 200 AMP terminal block.
Discard lockwasher.
(4) Set multimeter to ohms.
(5) Connect positive (+) probe of multimeter
to left 24V LOAD terminal stud on 200
AMP terminal block.
(6) Connect negative (-) probe of multimeter to
right 24V LOAD terminal stud on 200 AMP
terminal block and note reading on
multimeter.
(7) If continuity is not present, replace 200
AMP terminal block (para 20-58).
Change 1
2-284.17
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |