Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
(1) Remove circuit breaker CB70 from PDP.
(2) Position master power switch to on
(TM 9-2320-366-10-1).
(3) Set multimeter to ohms.
(4) Connect positive (+) probe of multimeter to
relay K2 socket 86 on PDP.
(5) Connect negative (-) probe of multimeter to
circuit breaker CB70 socket 4 on PDP and
note reading on multimeter.
(6) If continuity is not present, go to step 14
of this fault.
(7) Position master power switch to off
(TM 9-2320-366-10-1).
(8) Install circuit breaker CB70 in PDP.
Change 1
2-277

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business