|
|
TM 9-2320-366-20-1
CONTINUITY TEST
(1) Set multimeter to ohms.
(2) Connect positive (+) probe of multimeter
to terminal lug TL80.
CAUTION
When testing to terminal X2 on PDP,
ensure that multimeter probes come in
contact with the outside metal ring. Failure
to comply may result in false
troubleshooting test results.
(3) Connect negative (-) probe of multimeter to
terminal block X2 on PDP and note reading
on multimeter.
(4) If continuity is not present, replace 200
AMP terminal block to PDP 12 VDC cable
(para 20-54).
(5) Position terminal lug TL80 on left 12V
LOAD terminal stud on 200 AMP terminal
block with washer, lockwasher, and nut.
(6) Tighten nut to 15-19 lb-ft (21-25 N.m).
(7) Position dust boot on left 12V LOAD
terminal stud on 200 AMP terminal block.
Change 1
2-266.29
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |