Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
(1) Set multimeter to ohms.
(2) Connect positive (+) probe of multimeter
to terminal lug TL80.
CAUTION
When testing to terminal X2 on PDP,
ensure that multimeter probes come in
contact with the outside metal ring. Failure
to comply may result in false
troubleshooting test results.
(3) Connect negative (-) probe of multimeter to
terminal block X2 on PDP and note reading
on multimeter.
(4) If continuity is not present, replace 200
AMP terminal block to PDP 12 VDC cable
(para 20-54).
(5) Position terminal lug TL80 on left 12V
LOAD terminal stud on 200 AMP terminal
block with washer, lockwasher, and nut.
(6) Tighten nut to 15-19 lb-ft (21-25 N.m).
(7) Position dust boot on left 12V LOAD
terminal stud on 200 AMP terminal block.
Change 1
2-266.29

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business