Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
(1) Lift dust boot on left 12V LOAD terminal
stud on 200 AMP terminal block.
(2) Remove nut, lockwasher, washer, and
terminal lug TL80 from left 12V LOAD
terminal stud on 200 AMP terminal block.
Discard lockwasher.
(3) Remove nut, lockwasher, washer, and
terminal lug TL172 from right 12V LOAD
terminal stud on 200 AMP terminal block.
Discard lockwasher.
(4) Set multimeter to ohms.
(5) Connect positive (+) probe of multimeter to
left 12V LOAD terminal stud on 200 AMP
terminal block.
(6) Connect negative (-) probe of multimeter to
right 12V LOAD terminal stud on 200 AMP
terminal block and note reading on
multimeter.
(7) If continuity is not present, replace 200 AMP
terminal block (para 20-58).
Change 1
2-266.27

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business