Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
(1) Disconnect batteries (para 7-57).
(2) Remove nut, lockwasher, washer, and
terminal lug TL47 from left 12V BAT
terminal stud on 200 AMP terminal
block. Discard lockwasher.
(3) Remove nut, lockwasher, washer, and
terminal lugs TL171 and TL61 from right
12V BAT terminal stud on 200 AMP
terminal block. Discard lockwasher.
(4) Set multimeter to ohms.
(5) Connect positive (+) probe of multimeter
to left 12V BAT terminal stud on 200 AMP
terminal block.
(6) Connect negative (-) probe of multimeter to
right 12V BAT terminal stud on 200 AMP
terminal block and note reading on
multimeter.
(7) If continuity is not present, replace 200
AMP terminal block (para 20-58).
(8) Position terminal lug TL47 on left 12V BAT
terminal stud on 200 AMP terminal block
with washer, lockwasher, and nut.
(9) Tighten nut to 15-19 lb-ft (21-25 N.m).
Change 1
2-266.25

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business