TM 9-2320-366-20-1
CONTINUITY TEST
(1) Lift terminal cover on 12V BAT terminal
stud on 100 AMP reverse polarity relay.
(2) Remove nut, lockwasher, terminal lug
TL61, and terminal lug TL47 from 12V BAT
terminal stud on 100 AMP reverse polarity
relay. Discard lockwasher.
(3) Set multimeter to ohms.
(4) Connect positive probe (+) of multimeter
to terminal lug TL99.
(5) Connect negative probe (-) of multimeter to
terminal lug TL47 and note reading on
multimeter.
(6) If continuity is not present, replace battery
to 100 AMP reverse polarity relay 12 VDC
cable (para 7-74).
(7) If continuity is present, replace 100 AMP
reverse polarity relay (para 7-30).
(8) Lift terminal cover on 12V BAT terminal
stud on 100 AMP reverse polarity relay.
(9) Position terminal lugs TL47 and TL61 on
12V BAT terminal stud on 100 AMP
reverse polarity relay with lockwasher and
nut.
(10) Tighten nut to 120-144 lb-in.
(14-16 N.m).
(11) Position air hose on intake air cleaner boot
with clamp.
(12) Tighten clamp to 36-48 lb-in. (4-5 N.m).
(13) Connect batteries (para 7-57).
(14) Raise spare tire (TM 9-2320-366-10-2).
Change 1
2-266.23
|