Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
CONTINUITY TEST
(1) Lift terminal cover on 12V BAT terminal
stud on 100 AMP reverse polarity relay.
(2) Remove nut, lockwasher, terminal lug
TL61, and terminal lug TL47 from 12V BAT
terminal stud on 100 AMP reverse polarity
relay. Discard lockwasher.
(3) Set multimeter to ohms.
(4) Connect positive probe (+) of multimeter
to terminal lug TL99.
(5) Connect negative probe (-) of multimeter to
terminal lug TL47 and note reading on
multimeter.
(6) If continuity is not present, replace battery
to 100 AMP reverse polarity relay 12 VDC
cable (para 7-74).
(7) If continuity is present, replace 100 AMP
reverse polarity relay (para 7-30).
(8) Lift terminal cover on 12V BAT terminal
stud on 100 AMP reverse polarity relay.
(9) Position terminal lugs TL47 and TL61 on
12V BAT terminal stud on 100 AMP
reverse polarity relay with lockwasher and
nut.
(10) Tighten nut to 120-144 lb-in.
(14-16 N.m).
(11) Position air hose on intake air cleaner boot
with clamp.
(12) Tighten clamp to 36-48 lb-in. (4-5 N.m).
(13) Connect batteries (para 7-57).
(14) Raise spare tire (TM 9-2320-366-10-2).
Change 1
2-266.23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business