|
|
TM 9-2320-366-20-1
CONTINUITY TEST
(1) Remove relay K11 from PDP.
(2) Set multimeter to ohms.
(3) Connect positive (+) probe of multimeter to
relay K24 socket 85 on PDP.
(4) Connect negative (-) probe of multimeter to
relay K11 socket 85 on PDP and note
reading on multimeter.
(5) If continuity is not present, repair wire 34
from relay K24 socket 85 on PDP to relay
K11 socket 85 on PDP (para 2-45) or replace
WTEC II dashboard cable assembly
(para 7-10) or WTEC III dashboard cable
assembly (para 7-11).
(6) Install relay K24 in PDP.
Change 1
2-213
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |