Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
Open manhole cover (TM 9-2320-279-10).
(8)
Set TLI TANK LEVEL INDICATOR switch (3) to on.
(9)
Soldier A holds float (6) in UP position while Soldier B turns screw (7).
(10)
Soldier C tells Soldier B to stop turning screw (7) when TLI TANK LEVEL INDICATOR gage (4)
(11)
reads 1/4.
Soldier A holds floats (6 and 8) in UP position while Soldier B turns screw (9).
(12)
Soldier C tells Soldier B to stop turning screw (9) when TLI TANK LEVEL INDICATOR gage (4)
(13)
reads 1/2.
Soldier A holds floats (6, 8, and 10) in UP position while Soldier B turns screw (11).
(14)
Soldier C tells Soldier B to stop turning screw (11) when TLI TANK LEVEL INDICATOR gage (4)
(15)
reads 3/4.
Soldier A holds floats (6, 8, 10, and 12) in UP position while Soldier B turns screw (13).
(16)
Soldier C tells Soldier B to stop turning screw (13) when TLI TANK LEVEL INDICATOR gage (4)
(17)
reads FULL.
Set TLI TANK LEVEL INDICATOR switch (3) off.
(18)
Install cap (1) on tank level indicator adjuster (2).
(19)
d.
Follow-on  Maintenance.
(1) Connect batteries (para 7-91).
(2) Install pump module left side access panel (para 16-48).
(3) Close pump module rear access doors (TM 9-2320-279-10).
END OF TASK
7-318

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business