Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
7-72. WORK LAMPS AND BRACKET REMOVAL/INSTALLATION (M984) (CONT).
(7) Tie knots in wires (23 and 24)
and (25 and 26).
(8) Install screw (27) and two wires (24
and 25) with lockwasher (28) and
nut (29).
(9) Connect wire (4) to wires (23
and 26) using butt connector (30).
(10) Connect wire (4) at
connector (31).
(11) Install bracket (3) and
chain (22) with four
screws (32),
lockwashers (33), and
nuts (34).
c. Follow-on  Maintenance.
(1) Connect  batteries
(2) Check operation of work
lamps (TM 9-2320-354-10).
END OF TASK
7-256

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business