Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
7-54. OUTRIGGER SWITCH BOX REMOVAL/lNSTALLATlON (M984) (CONT).
(3) Install six wires (6) on two outrigger switches (2) with
six screws (7) and lockwashers (8).
(4) Install outrigger switch box (3) with
four screws (9), lockwashers (10), and
nuts (11).
c. Follow-on Maintenance.
(1) Connect batteries (para 7-91).
(2) Close stowage box
(TM 9-2320-279- 10).
(3) Start engine (TM 9-2320-279-10).
(4) Check outrigger switch operation
(TM 9-2320-354-10).
(5) Shut off engine (TM 9-2320-279-10).
END OF TASK
7-187

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business