Click here to make tpub.com your Home Page

Page Title: Installation.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
b. Installation.
NOTE
One circuit breaker requires special orientation at installation. Do step (1) and
continue with step (2).
Remaining 11 circuit breakers are installed in a similar manner. Do step (1.1) and
continue with step (2).
Snap in circuit breaker (1) with short post to No. 084 wire (driver's side).
(1)
Snap in circuit breaker (1.1).
(1.1)
Install bus bar (2) if required.
(2)
Install wires (3).
(3)
Install two nuts (4) on circuit
(4)
breaker (1) plus those required on bus
bar (2).
(5)  Install heater compartment covers (5
and 6) with 11 screws (7).
c.  Follow-on Maintenance. Connect
batteries (para 7-91).
END OF TASK
7-121
Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business