Click here to make tpub.com your Home Page

Page Title: FRAME 9
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-4
FRAME 9
1.
T a k e out terminal screw (1) on overheat thermostat (2). Put on two over-
h e a t thermostat electrical leads (3 and 4).  S c r e w in and tighten terminal
screw (1).
D o step 1 again for terminal screw (5) on overheat thermostat (2) and
2.
e l e c t r i c a l leads (6 and 7).
T a k e out terminal screw (8) on terminal strip (9). Put on fuel control valve
3.
e l e c t r i c a l lead (10) on terminal strip (9).  S c r e w in and tighten terminal
screw (8).
GO TO FRAME 10
19-89

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business