|
|
TM 9-2320-211-34-2-3
g. R e p l a c e m e n t .
FRAME 1
Soldier A 1.
Route electrical lead (1) through opening at bottom of pivot post (2).
Soldier B 2.
U s i n g chain hoist, put swivel valve (3) in place on pivot post (2).
GO TO FRAME 2
17-857
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |