|
|
TM 9-2320-211-34-2-3
FRAME
3
Soldier A
1.
U s i n g short chain and chain hoist, lift out and hold swivel
valve (1).
Soldier B
2.
U n s c r e w four coupling nuts (2) and take off four hydraulic
lines (3). Cap lines.
3.
U n s c r e w coupling nut (4) and take off hydraulic line (5).
C a p line.
U n s c r e w and take out two screws (6) . Take off two retaining
4.
plates (7).
T a k e off two nipples (8) with couplings (9).
5.
Soldier A
U s i n g short chain and chain hoist, set swivel valve (1) down on
6.
w o r k bench.
END OF TASK
17-848
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |