|
|
TM
9-2320-211-34-2-3
FRAME 6
1.
Lineup slot in shaft (1) with fork (2).
2.
P u t in screw (3).
P u t in safety wire (4).
3.
4.
P u t ball (5) and spring (6) in place.
5.
P u t in retainer (7).
6.
P u t cover (8) and gasket (9) in place.
7.
P u t in six screws (10) with washers.
GO TO FRAME 7
17-834
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |