|
|
TM
9-2320-211-34-2-3
FRAME 4
1.
P u t lever (1) in place on shaft of transmission power takeoff (2).
2.
P u t in screw and washer (3).
3.
P u t in screw (4) and put on nut (5).
4.
C h e c k that number of threads showing on linkage (6) is the same as noted.
5.
P u t linkage (6) on lever (7) and put in clevis pin (8). Put in cotter pin (9).
6.
P u t linkage (6) on lever (1).
P u s h clevis pin (10) all the way in.
GO TO FRAME 5
17-810
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |