|
|
TM 9-2320-211-34-2-3
FRAME
3
Take out and throw away three cotter pins (1).
1.
2.
Take out three clevis pins (2 and 3).
3.
Take off linkage (4). Take linkage (5) off transfer lever (6).
4.
Take off two nuts (7) and take out two bolts (8).
5.
Lift transfer lever assembly (6) and power takeoff lever assembly (9) out of truck.
GO TO FRAME 4
17-803
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |