|
|
TM 9-2320-211-34-2-3
TRANSMISSION POWER TAKEOFF CONTROLS AND LINKAGES REMOVAL,
17-59.
R E P A I R , AND REPLACEMENT.
N o special tools required
TOOLS:
C o t t e r pin
SUPPLIES:
S o l v e n t , dry cleaning, type II (SD-2), Fed. Spec P-D-680
P E R S O N N E L : One
T r u c k parked, engine off, handbrake set.
EQUIPMENT CONDITION:
Removal.
a.
FRAME 1
1.
L i f t up companion seat (1).
2.
T a k e out 12 screws (2) and lockwashers (3) from front tunnel (4).
L i f t up and slide off front tunnel (4).
3.
T a k e out 8 screws (5) and lockwashers (6) from toeboard (7). Take off toe-
4.
board.
Lift up and slide off rear tunnel
Take out six screws (8) and lockwashers (9).
5.
(10).
GO TO FRAME 2
17-801
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |