Click here to make tpub.com your Home Page

Page Title: Replacement.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-3
h.
Replacement.
FRAME 1
Soldier A 1.
Lower hoist cable (1) through opening in bottom of tool compartment (2).
Slide power divider and crane drive assembly (3) into position below
Soldier B 2.
truck. Join hook on hoist cable (1) to power divider lift ring (4). Guide
power divider and crane drive assembly as soldier A raises it.
Using hoist, raise power divider and crane drive assembly (3) into place.
Soldier A 3,
Hold two nuts (5).
Soldier B 4.
Put in, but do not tighten, two front mounting screws (6).
Soldier A 5.
NOTE
Follow-on Maintenance Action Required:
Replace power divider-to-hydraulic hoist pump propeller
1.
s h a f t . Refer to TM 9-2320-211-20,
R e p l a c e input propeller and winch propeller shafts.
2.
R e f e r to TM 9-2320-211-20.
R e p l a c e pump propeller shaft-to-power divider dust
3.
b o o t . Refer to TM 9-2320-211-20.
Replace transfer-to-power divider propeller shaft,
4.
Refer to TM 9-2320-211-20.
R e p l a c e power divider-to-winch propeller shaft. Refer
5.
to TM 9-2320-211-20.
R e p l a c e power divider linkage. Refer to para 17-53.
6.
7.
R e p l a c e control valve assembly. Refer to para 17-51,
F i l l power divider assembly as given in LO 9-2320-211-12.
8.
C h e c k power divider assembly for proper operation.
9.
R e f e r to TM 9-2320-211-10.
END OF TASK
17-770

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business