Click here to make tpub.com your Home Page

Page Title: FRAME 12
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-3
FRAME 12
Put gasket (1) and cover (2) in place.
1.
Put in four screws (3) and lockswashers (4).
2.
Press seal (5) into cap (6).
3.
Put gasket (7) and cap (6) with seal (5) in place.
4.
Put in four screws (8) and lockwashers (9).
5.
Fasten dial indicator to housing (10) so that plunger of dial gage is against end of
6.
output shaft (11) as shown.
7.
P u s h in and pull out output shaft (11) to check that end play is between 0.010
i n c h and 0.033 inch.
Take off dial indicator.
8.
If end play is not within limits given in step 7, do steps 10 through 13. If end play
9.
is within given limits, go to frame 13.
Take out four screws (8) and lockwashers (9).
1 0.
Take off cap (6) with seal (5).
11.
Put on another gasket (7). Put cap (6) with seal (5) back in place.
1 2.
Do steps 5 through 12 again until end play is within given limits.
1 3.
G o TO FRAME 13
17-760

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business