|
|
TM
9-2320-211-34-2-3
FRAME 3
1.
P u t link pin (1) through yoke (2) and arm (3).
2.
P u t cotter pin (4) in link pin (1). Open cotter pin (4).
3.
P u t nut (5) all the way on shaft (6). Put yoke (7) on shaft (6).
GO TO FRAME 4
17-710
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |