Click here to make tpub.com your Home Page

Page Title: FRAME 4
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-3
FRAME 4
Working inside front left side of gondola (1), put screw (2) in place as
Soldier A 1.
shown and hold it. Tell soldier B when ready.
Working outside front left side of gondola (1), hand tighten nut (3) and
Soldier B 2.
hold it. Tell soldier A when ready.
Tighten screw (2).
Soldier A 3.
Do steps 1 through 3 again for five screws (4) and nuts (5).
Soldiers
4.
A and B
Working inside rear left side of gondola (1), put in screw (6) and hold it.
Soldier A 5.
Tell soldier B when ready.
Working outside rear left side of gondola (1) hand tighten nut (7), and
Soldier B 6.
hold it. Tell soldier A when ready.
Tighten screw (6).
Soldier A 7.
Do steps 5 through 7 again for three screws (8) and nuts (9).
Soldiers
8.
A and B
GO TO FRAME 5
17-667

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business