|
|
TM 9-2320-211-34-2-3
FRAME
2
P u t lever (1) in place and put on washer (2). Put cotter pin (3) in place.
1.
P u t rotochamber assembly (4) in place.
2.
P u t in two screws (5) with lockwashers
(6).
P u t air line (7) in place. Put on sleeve nut (8).
3.
P u t clevis pin (9) in place.
4.
P u t cotter pin (10) in place.
NOTE
Follow-on Maintenance Action Required:
A d j u s t rotochamber clutch release lever. Refer to
1.
T M 9-2320-211-20.
2.
R e p l a c e cab tunnel. R e f e r to TM 9-2320-211-20.
END OF TASK
17-602
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |