|
|
TM 9-2320-211-34-2-3
H o o k up chain sling and chain hoist to inner boom (1).
Soldiers A, 1.
Band C
Soldier
A
2.
U s i n g chain sling and chain hoist, t a k e up slack to support inner
boom (1).
P u t prybar through center hole (2) in inner boom (1) and turn
Soldiers
3.
B and C
i n n e r boom on its side to work on two top roller tracks (3) and
t w o bottom roller tracks (4).
Soldier
A
4.
U s i n g chain hoist, l o w e r inner boom (1) onto wood blocks.
T a k e off chain sling and chain hoist.
5.
Soldiers
6.
T a k e out 52 screws (5) and lift off two top roller tracks (3).
A and B
T a k e out 52 screws (6) and lift off two bottom roller tracks (4).
Soldiers
7.
A and B
END OF TASK
17-593
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |